You already have automation on board
Existing PLCs, instruments and networks can be reused. We assess what fits and integrate it without replacing what works.

When the challenge is specific, the solution has to be too. We design, supply, install and maintain measurement and supervision systems tailored to your vessel and your operation.
Existing PLCs, instruments and networks can be reused. We assess what fits and integrate it without replacing what works.
Contractual consumption, charterer KPIs, tolerance limits or specific reports that a generic product doesn't cover.
Integration with ERP, fleet management, BI or charterer systems, with a clear data contract.
The best moment to plan measurement and supervision is before the cables are pulled. We join the project from the start.
Signal map, approved protocol and read-only access, together with your PLC integrator.
Selection and supply of sensors and meters, panels, industrial network and the onboard computer.
HMI and portal configured for your routine, with the indicators your operation actually uses.
Tolerances and criteria defined with your technical team, versioned and with an audit trail.
Automatic reports, exports and an API for your shore systems.
Adapters for what isn't on the platform yet, without creating a parallel version of the product.
Scope, acceptance criteria and schedule agreed before you commit. No surprises along the way.
01
Inventory of equipment, circuits, sensors and automation, with the vessel's documents, such as the capacity plan.
02
Measurement points, architecture, acceptance criteria and schedule. The scope is closed before contracting.
03
Instruments, panels, network and onboard computer; signal map and configuration with the PLC integrator.
04
Platform configuration, screens, reports and integrations, tested with simulated data before going on board (FAT).
05
Electrical, mechanical and network installation, calibration, onboard acceptance tests (SAT) and crew training.
06
As-built documentation, backup, updates and support. The system evolves with your operation.
The project starts at the measurement points and ends in the screens and reports your operation actually uses — in the format of your contract, not of a generic product.
Vessel Tech · Signal map
Demo vessel
Signal map
Measurement points integrated in read-only mode, with source, quality and age
| Tag | Source | Protocol | Value | Quality | Age |
|---|---|---|---|---|---|
| FO.TK2P.LEVEL | Level radar | 4–20 mA | 2.84 m | Good | 1 s |
| ME.SB.FLOW.IN | Flow meter | Modbus RTU | 824 kg/h | Good | 1 s |
| ME.SB.LOAD | Engine ECM | J1939 | 80 % | Good | 1 s |
| ME.SB.RPM | Automation PLC | Modbus TCP | 1,480 rpm | Good | 1 s |
| HULL.TRIM | Inclinometer | NMEA 2000 | 0.42 m | Good | 1 s |
| SWB.DEMAND | Switchboard meter | Modbus TCP | 162 kW | Good | 2 s |
| NAV.SOG | GNSS | NMEA 0183 | 9.6 kn | Good | 1 s |
| AE1.FLOW.ECM | Engine ECM | J1939 | 41 kg/h | Estimated | 1 s |
| FO.TK4S.TEMP | Automation PLC | Modbus TCP | 31.2 °C | Stale | 3 min |
Demo interface — fictitious data
Every signal with source, protocol, quality and age. What comes from the PLC, what comes from a new sensor and what is estimated are explicit.
Efficiency reports
Generated automatically from onboard records. Also available on the HMI, even without a link.
Consumption this month
208.6 t
Against the contract
+1.8 %
In transit
46.5 kg/nm
Average specific consumption
203 g/kWh
CO₂ emissions
668.8 t
Consumption rate by mode × contract · t/day
Contractual · Actual = value
Daily consumption by mode · t
Specific consumption × baseline · weekly variation corrected for load
+1.4 %
+2.9 %
+1.9 %
+1.0 %
Highlights and recommendations of the month
Demo interface — fictitious data
Consumption by mode against the contractual rates, charterer KPIs and automatic export to shore systems.
Two main engines and two auxiliaries, service and cargo tanks, and the requirement to show inventory and consumption in real time on board and ashore.
Illustrative scope based on a real requirement, without identifying the client. Every project is sized after the onboard survey.

Tell us what you need to measure, supervise or integrate. The first conversation is technical and with no commitment.